3rd floor report for 8/9/10

Slow, but steady she goes.  We have sheetrock on some of the new wall frames, new wiring for both electrical and networking, and the frames for the lab windows and door are in.  Pictures taken today are below.


The 4 openings on the left will be tempered glass windows to let in the light from the hall window. On the right is the 3 openings for a new door and more windows on the side.

The 1/2 wall dividing the tables and chairs work spaces and the computer workstations is framed and some of the wiring is in.
Soffit and wiring in the new meeting room
Workers various stuff in the soon to be IT Staff office space
New Diagnostic Center